Equipment Scope
Calendar Year
2008 Frequency Comment
Pole-Top Transformer Visual 2-4 Years
Thermography 0.5-4 Years Depends on criticality
Submersible Switches Visual 3 Years
Distribution Network Protector Operations Counter Reading 1 Year
Visual 1 Year
Maintain Contacts and Arc Chutes 1-5 Years Depends on criticality
Circuit Breaker Inspection 1-5 Years Depends on criticality
Clean & Lubricate 1-5 Years Depends on criticality
Relay and Mechanism Frame Inspection 1-5 Years Depends on criticality
Enclosure Inspection 1-5 Years Depends on criticality
Enclosure Leak Test 1-5 Years Depends on criticality
Relay Calibration 1-2 Years Depends on criticality
Circuit Breaker, Vacuum, 4 - 34 kV Check Red (Closed) Indicating Lamp 5W-6M Depends on criticality
Visual 5W-6M Depends on criticality
Thermography 1-4 Years Depends on criticality
Contact Resistance (Ductor) Test 6-Years
Hi Pot Test on Vacuum Bottles 6-Years
Exercise Mechanism 3-Years
Aux Contact Block Inspection 6-Years
Cubicle / Cabinet Maintenance 6-Years
Mechanism Lubrication / Maintenance 6-Years
Inspect Vacuum Bottles 6-Years
Check Control Cabinet / Cubicle Heaters 5W-6M Depends on criticality
Circuit Breakers, Air Magnetic, 4-
12 kV Check Red (Closed) Indicating Lamp 5W-6M Depends on criticality
Visual 5W-6M Depends on criticality
Thermography 1-4 Years Depends on criticality
Contact Resistance (Ductor) Test 6-Years
Exercise Mechanism 3-Years
Aux Contact Block Inspection 6-Years
Cubicle / Cabinet Maintenance 6-Years
Mechanism Lubrication / Maintenance 6-Years
Check Control Cabinet / Cubicle Heaters 5W-6M Depends on criticality
Circuit Breaker, Oil, 4 - 13 kV Check Breaker Oil Level 5W-6M Depends on criticality
Check Red (Closed) Indicating Lamp 5W-6M Depends on criticality
Visual 5W-6M Depends on criticality
Oil Dielectric Test 1-Year
Thermography 1-4 Years Depends on criticality
Check Overflow Tank Level 5W-6M Depends on criticality
Exercise Mechanism 3-Years
Mechanism Lubrication / Maintenance 3-Years
Check Heaters 5W-6M Depends on criticality
Substation Capacitor Bank Monitor Phase/Neutral Balance Continuous SCADA
Visual 5W-6M Depends on criticality
Check Control Cabinet / Vac. Oil Switch 5W-6M Depends on criticality
Thermography 1-4 Years Depends on criticality