ILLINOIS REGISTER 10486
09
POLLUTION CONTROL BOARD
NOTICE OF ADOPTED AMENDMENTS
submitted with the formal evaluation program pursuant to
subsection (e)(1)(A) of this Section.
C) Notwithstanding 35 Ill. Adm. Code 201.146(hhh), the owner or
operator of the EGU must obtain a construction permit for any new
or modified air pollution control equipment to be constructed as
part of the evaluation of the alternative control technique.
D) The owner or operator of the EGU must submit a report to the
Agency, no later than 90 days after the conclusion of the formal
evaluation program describing the evaluation that was conducted,
and providing the results of the formal evaluation program.
2) If the evaluation of the alternative control technique shows less effective
control of mercury emissions from the EGU than achieved with the prior
control technique, the owner or operator of the EGU must resume use of
the prior control technique. If the evaluation of the alternative control
technique shows comparable control effectiveness, the owner or operator
of the EGU may either continue to use the alternative control technique in
an optimum manner or resume use of the prior control technique. If the
evaluation of the alternative control technique shows more effective
control of mercury emissions, the owner or operator of the EGU must
continue to use the alternative control technique in an optimum manner, if
it continues to operate pursuant to this Section.
(Source: Amended at 33 Ill. Reg. 10427, effective June 26, 2009)
Section 225.235 Units Scheduled for Permanent Shut Down
a) The emission standards of Section 225.230(a) are not applicable to an EGU that
will be permanently shut down as described in this Section:
1) The owner or operator of an EGU that relies on this Section must
complete the following actions before June 30, 2009:
A) Have notified the Agency that it is planning to permanently shut
down the EGU by the applicable date specified in subsection (a)(3)
or (4) of this Section. This notification must include a description
of the actions that have already been taken to allow the shut down