Skip to main content

Illinois Digital Archives

Add or remove other collections to your search:



You've searched: All Collections

  • All fields: Creek
(2385 results)



Display: 20

    • I-80 west of Geneseo

    • 1-80; District Office; IDOT
    • The Illinois Department of Transportation announces today that weather permitting, construction work on I-80 west of Geneseo will begin on Monday, September 20, 2010. Brandt Construction Company is making repairs to the I-80 bridge over Mineral...
    • 119th Street Bridge Replacement in Palos Park

    • 119th Street Bridge; IDOT; Palos Park; Replacement
    • The Illinois Department of Transportation announced that a project to remove and replace the 119th Street bridge over Mill Creek in Palos Park is scheduled to begin, weather permitting, on Sunday, April 1.
    • Groundwater discharge to Illinois streams

    • 1980; Apple River; Bay Creek (Sny, The); Beaucoup Creek; Big Bureau Creek; Big Creek (Cache); Big Muddy River; Blackberry Creek; Bluegrass Creek; Bonpas Creek; Cache River; Cedar Creek Chicago River Court Creek Watershed Crooked Creek Des Plaines...
    • Driven by the force of gravity, water continually moves between the land surface and the subsurface environments. Our knowledge of this process is limited by the large number of interdependent factors involved. A better understanding of these...
    • Effect of Stratton Dam operation on flood control along the Fox River and Fox Chain of Lakes

    • 1992; Channel Lake; Dam; Dams; Flood control; Fox River (UpperFox); ISWS CR-533; Knapp, H. Vernon, and Terry W. Ortel; Lake; McHenry Lock and Dam; Nippersink Creek; Stratton Dam; Stream
    • The purpose of this study was to use models to simulate the effect of the Stratton Dam operation, and possible structural modifications such as the addition of Foster gates, on flood stages and discharges in the Fox River and the Fox Chain of...
    • Fox River streamflow assessment model: 1999 update to the hydrologic analysis

    • 1999; Blackberry Creek; Boone Creek; Ferson Creek; Hydrologic models; ISWS CR-649; Indian Creek (Lower Fox); Knapp, H. Vernon, and Michael W. Myers; Lake; Nippersink Creek (Upper Fox); Poplar Creek; Shabbona Lake; Somonauk Creek; Stream; Stream...
    • The Illinois Streamflow Assessment Model (ILSAM) was developed to provideneeded streamflow information to watershed managers and planners. This specialized software program was developed for use on a personal computer to provide estimates of the...
    • Watershed monitoring for the Lake Decatur watershed, 1998-1999

    • 2000; Big Creek (Upper Sangamon); Big Ditch; Camp Creek (Upper Sangamon); Canal; Friends Creek; Goose Creek (Upper Sangamon); ISWS CR 2000-06; Keefer, Laura and Misganaw Demissie; Long Creek (Upper Sangamon); Nitrates -\- Environmental aspects;...
    • Lake Decatur is the water supply reservoir for the City of Decatur. The reservoir was created in 1922 by constructing a dam to impound the flow of the Sangamon River with an original water volume of 20,000 acre-feet and an area of 4.4 square miles....
    • Hydrologic modeling of the Court Creek watershed

    • 2000; Borah, Deva K., and Maitreyee Bera; Court Creek; Hydrologic models; ISWS CR 2000-04; Stream
    • Flooding, upland soil and streambank erosion, sedimentation, and contamination of drinking water from agricultural chemicals (nutrients and pesticides/herbicides) are critical environmental problems in Illinois. Upland soil erosion causes loss of...
    • Benchmark sedimentation survey of the lower Cache River wetlands.

    • 2001; Allgire, Richard L., and Richard A. Cahill; Big Creek (Cache); Cache River; Cache Watershed; Cypress Creek; Eagle Pond (Historical); Goose Pond (Wayne County); ISWS CR 2001-17; Lake; Sediment transport; Sedimentation analysis; Stream;...
    • The Cache River located in the southernmost part of Illinois flows through an area containing the Cache River Wetlands. These unique and important wetlands were designated as a Ramsar Site in 1996. Drainage activities divided the Cache River in...
    • Streamflow assessment model for the Little Wabash River Watershed : hydrologic analysis

    • 2001; Auxier Creek; Big Muddy Creek; Borah Lake; CIPS Lake; Canal; East Fork Lake (ISWS - Richland County); Elm River; Forbes Lake; Fox River (Richland County); Goose Pond (Wayne County); Greendale Lake; Horse Creek; ISWS CR 2001-14; Illinois...
    • The Illinois Streamflow Assessment Model (ILSAM) is an analytical and information tool developed to predict the frequency of streamflows, and water use impacts on streamflows, for every stream in selected major watersheds in Illinois. The current...
    • Historical sedimentation at the mouths of five deltas on Peoria Lake.

    • 2001; Bhowmik, Nani G., Erin Bauer, William C. Bogner, and Mike Demissie; Blalock Creek; Blue Creek; Crow Creek; Dry Creek; Farm Creek; Funks Run; ISWS CR 2001-08; Illinois River; Lake; Partridge Creek (Lower Illinois - Senachwine); Peoria Lake;...
    • This report summarizes the results of surveying conducted at the mouths of five deltas on Peoria Lake in 1999. The five deltas are at the mouths of Richland Creek, Partridge Creek, Blue Creek, Dickison Run, and Farm Creek. All surveying was done to...
    • Hydrology of the Big Creek Watershed and its influence on the Lower Cache River

    • 2001; Big Creek (Cache); Cache Watershed; Demissie, Misganaw, H. Vernon Knapp, Paminder Parmar, and Daniel J. Kriesant; Hydrology; ISWS CR 2001-06; Sediment transport; Stream; Watershed
    • A primary concern in the management of the Lower Cache River is the amount of sediment that is deposited in the river's valley in the vicinity of Buttonland Swamp. From previous monitoring studies it is known that floodwaters from Big Creek convey...
    • Watershed monitoring for the Lake Decatur Watershed, 1999-2000.

    • 2002; Big Creek (Upper Sangamon); Big Ditch; Camp Creek (Upper Sangamon); Canal; Friends Creek; Goose Creek (Upper Sangamon); ISWS CR 2002-01; Keefer, Laura and Misganaw Demissie; Long Creek (Upper Sangamon); Nitrates -\- Environmental aspects;...
    • Lake Decatur is the water supply reservoir for the City of Decatur. The reservoir was created in 1922 by constructing a dam to impound the flow of the Sangamon River. The dam was modified in 1956 to increase the maximum capacity of the lake to...
    • Watershed monitoring for the Lake Decatur Watershed, 1999-2000.

    • 2002; Big Creek (Upper Sangamon); Big Ditch; Camp Creek (Upper Sangamon); Canal; Friends Creek; Goose Creek (Upper Sangamon); ISWS CR 2002-01; Keefer, Laura and Misganaw Demissie; Long Creek (Upper Sangamon); Nitrates -\- Environmental aspects;...
    • Lake Decatur is the water supply reservoir for the City of Decatur. The reservoir was created in 1922 by constructing a dam to impound the flow of the Sangamon River. The dam was modified in 1956 to increase the maximum capacity of the lake to...
    • Bay Creek Watershed TMDL Report

    • 303d List; Bay Creek; Dissolved Oxygen Impairment; Phosphorus; TMDL; Total Maximum Daily Load; Water Quality Management; Watershed Management; Watersheds
    • This report documents the analysis and findings of stage 1 of the TMDL development for water segments within this watershed. Water quality data are gathered by the IEPA, the US Geological Survey, and the USEPA. Illinois is required to identify...

QuickView

Display a larger image and more item information when the pointer pauses over a thumbnail
 

Layout options:

Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK
Select the collections to add or remove from your search
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
 
OK